Description:
Modification, relocation, and expansion of the existing baggage conveying systems,
tug roads and ramps, and underground utilities to allow for the construction of a
future basement expansion.
Location:
Washington Dulles International Airport (IAD), Dulles, Virginia
Owner:
Metropolitan Washington Airport Authority (MWAA)
Duration:
2011 to 2012